Numéro de contact pour Boseto Copper Mining

Discovery Metals Limited, What really happened?

Dramatic Performance of DML Stock. DML had a surge of over 66% in its share value on March 1. This was a result of DML having signed a binding MoU with Castlepines Global Equity Limited, where a 34% stake in Boseto Copper Mine would exchange hands for a US$110 million price tag. DML closed the day on March 1 with its …

Boseto Copper Mine Botswana, Resourcesl | Zutari

The tailings storage facility (TSF) divides into three segments of which segment one is now full with no free board. Haphazard previous deposition has severely curtailed the …

Khoemacau copper/silver project, Botswana – update

The project has the capacity to produce 155 000 t/y to 165 000 t/y of high-grade copper and silver concentrate, containing an estimated 60 000 t to 65 000 t of payable copper and 1.8-million to 2 ...

Boseto copper project, Botswana

Contact Details for Project Information Discovery Metals, tel +61 7 3218 0222, fax +61 7 3218 0233 or email [email protected]; or Discovery Metals …

Khoemacau Copper-Silver Project, North-west, Botswana

Khoemacau Copper Mining, a subsidiary of Cupric Canyon, is developing the project, which was acquired along with the nearby Boseto licenses and complex in 2015. Estimated to cost $397m to construct, the project is expected to produce 62,000 tonnes (t) of copper and 1.9 million ounces (Moz) of silver in the initial stages.

Botswana's new mine – Boseto copper/silver – is ramping up

Discovery Metals is making good progress on the commissioning and the ramp up of copper-silver concentrate production at its owned Boseto copper project in northwest Botswana. It is designed to produce an average of some 36,000 t/y copper and 1.1 Moz silver in concentrate from 3 Mt/y of ore feed. Open pit mining production at …

MMG to acquire Khoemacau copper mine in Botswana in …

Khoemacau Copper Mining CEO Johan Ferreira said: "We would like to thank the current owners, who as custodians of Khoemacau over many years, successfully transformed the company from a development idea to a fully-fledged operating copper mine. "Having successfully completed the ramp up of the Zone 5/Boseto operations, the …

Boseto copper project, Botswana

Contact Details for Project Information Discovery Metals, tel +61 7 3218 0222, fax +61 7 3218 0233 or email [email protected]; or Discovery Metals Botswana, tel +267 318 0751 or fax +267 ...

Khoemacau Copper Mining announces First …

approximately 40% copper along with high-grade silver. This results in annual production of 60 000 to 65 000 tonnes copper and 1.8 to 2.0 million ounces silver per annum over a mine life in excess of 20 years. The average life-of-mine C1 cash costs are forecast at US$1.30/lb, with all in sustaining costs of

Khoemacau Copper Mining

Khoemacau summary 3 High quality asset base in an attractive jurisdiction Botswana is a strongly democratic country, being politically and socially supportive of mining with a well-established regulatory framework Defined 168Mt of high-grade copper MI&I resources at 2.09% copper and 27.5g/t silver −Flagship Zone 5 orebody discovered in 2012, hosts …

Boseto Copper Mine Botswana, Resourcesl | Zutari

The raise of the tailings facility for the Boseto Copper Mine, impacts the integrity of the TSF through its life span of 10 to 15 years. *The Aurecon Africa business has been officially renamed Zutari as at 21 July 2020. Zutari acquired Aurecon Middle East on 20 November 2020. The existing tailings facility at the mine has been built to the top ...

Boseto Copper Mine | Statistics Botswana

Boseto Copper Mine | Statistics Botswana. May 2024: Inflation Rate= 3.0%. Trade Statistics March 2024: Total Imports in million Pula = 6,991.0 Total Exports in Million Pula=4,518.5 Trade Balance in Million Pula = (2,472.5) Index of Mining Production Q4 2023 = 101.8. Index of Electricity Generation Q4 2023 = 155.6.

Mining Weekly

Latest Developments Progress continued on the ramp-up of production at the Boseto copper project in February 2013. Mining production (waste plus ore) was 2.4-million tons. This was slightly above ...

Financial Provides Mining Fleet Financing for Copper …

Leave a comment. Discovery Metals said Financial SARL has joined a debt facility syndicate as a joint lead arranger. The facility, which includes $75 million in mobile mining fleet financing provided by , will fund the completion of a copper mining project in Botswana.

Discovery Metals to advance Boseto copper project

Drilling operations at Discovery's Boseto project in Botswana Brisbane, Australia — MININGREVIEW — 21 October 2009 – Australian exploration company Discovery Metals Limited "' listed on the ASX, AIM and the Botswana Stock Exchange "' is to seek funding through debt and equity to develop its flagship Boseto copper project in …

Discovery Metals Boseto (Botswana) copper project well on …

Deutsche Bank recently visited Boseto, where construction is underway at Discovery Metal's (DML) owned Boseto copper project in Botswana. The 3 Mt/y operation will produce ~35,000 t/y copper and 1 Moz/y silver at average cash costs of $1.48/lb, with commissioning salted for mid-2012.

Discovery Metals | Mining Digital

Discovery Metals goes underground for copper in Boseto heartland... Discovery Metals Limited is a copper and silver concentrate producer from its 100 percent owned major asset, the Boseto Copper Project in northwest Botswana. The company was founded in 2003, and work at Boseto began in 2005. The past five years have seen …

Aussie firm plans new $260m copper mine near Gantsi

Photo: sandfire.au. Sandfire Resources, an Australia Stock Exchange-listed group, has approved the construction of a $259 million (P2.9 billion) copper mine 80 kilometres from Gantsi, the latest such development on the Kalahari Copperbelt.. The 1,000-kilometre belt running south-west to the north-east is known to contain millions of tonnes …

Boseto Project | Discovery Metals limited | Projects and

The plant processes 3 Mt/a of ore consisting of three-stage crushing, ball milling, separate oxide and sulphide mineral flotation, regrinding of sulphide rougher concentrate, concentrate thickening and filtration, tailings thickening and disposal, reagents mixing, site services and electrical distribution. We designed the water supply pumping ...

Geology and paragenesis of the Boseto copper deposits, …

The Kalahari Copper Belt hosts numerous sediment-hosted Cu-Ag deposits, such as the Klein Aub Mine (Walraven and Borg, 1992) in Namibia, Boseto Mine (Hall, 2013 (Hall,, 2017Hall et al., 2018) and ...

Khoemacau Copper Mining (Pty) Ltd : Committed to …

Demonstrating its desire to further grow its operations and improve Botswana's economic outlook, Khoemacau recently concluded a deal through an offer of compromise to buy the mothballed Boseto Mine, which is only 30 kilometres away from the Somelo site. "The acquisition of Discovery Metals' Boseto Mine and its exploration …

Discovery's Boseto project very encouraging

Drilling operations at Discovery's Boseto copper project Brisbane, Australia — MININGREVIEW — 01 April 2010 – Discovery Metals (DML) "' an Australian mining exploration company focused on copper in north-western Botswana "' says the scoping study at its Boseto copper project has confirmed the economic viability of …

New and only copper mine in Botswana begins operation

The starter project development plan now involves the fully mechanised underground mining of sulphide ores at Zone 5 at a rate of 3.65 million tonnes per …

Boseto Copper Project, Ngamiland, Kalahari Copper

The Boseto copper mine is situated in Ngamiland in the Kalahari copper belt of north-west Botswana. The mine is owned by Australia-based Discovery …

4: Lateral mineral zonation map, Boseto Copper Deposits.

The Kalahari Copper Belt hosts numerous sediment-hosted Cu-Ag deposits, such as the Klein Aub Mine (Walraven and Borg, 1992) in Namibia, Boseto Mine (Hall, 2013 (Hall,, 2017Hall et al., 2018) and ...

Botswana's Khoemacau

Botswana made the headlines in June as it celebrated the official production start-up from the world-class Khoemacau copper/silver project.And while the delivery of first concentrate from any new Greenfields project is a milestone achievement in itself, there are many more reasons why this new mine should make it into the 'African mining hall of …

GEOLOGY AND PARAGENESIS OF THE BOSETO COPPER …

The Boseto copper deposits are the first deposits within the Kalahari Copperbelt to go into commercial production since the closure of the Klein Aub Mine in Namibia in 1986. Schwartz et al. (1995 ...

Khoemacau: Africa's Newest Copper-Silver …

Project Overview. The Khoemacau Copper (Cu) Project is massive, with 4040 km 2 of property in Botswana, and measured and indicated high-grade resources of 186 Mt at over 2% Cu and 27 g/t silver …

Another Copper Mine to Open in Toteng

Toteng in the Ngamiland District will get a second chance to host a copper mine with the re-opening of old Boseto Mine that will trade as Khoemacau Copper Mines. 5.6 C. Johannesburg. June 11, 2024. Contact Us; info@mining-africa ... Contact us: editor@mining-africa. Follow us. Facebook Twitter Whatsapp. @2021 - mining …

Boseto Copper Project

The Boseto Copper Project is located in north-west Botswana. The project is located on 1 of 14 granted tenements totalling over 10,100 square kilometres. This lightly explored and undeveloped portion of the Kalahari Copper Belt, with less than 330 km of a potential 1,300 strike kilometre length explored to date.

Discovery Metals goes underground for copper in …

The Botswanan government granted approval for the first of three expansion projects at Boseto in April, giving the go ahead for the proposed commencement of the Zeta underground mine, which will …

Creditors accept offer for liquidated Botswana copper mine

The offer for Discovery Copper Botswana, the owner of Boseto, was made by Botswana's Cupric Canyon Capital, whose subisidiary Khoemacau Copper Mining has been in dialogue with its stricken ...

Paving the way in Botswana for Khoemacau copper project

Tackling the demanding conditions of Botswana's Kalahari Desert, Concor Infrastructure is nearing completion of a 35 km access road for the Khoemacau copper silver starter project. The company is also busy with constructing a parallel haul road, as well as conducting earthworks and concrete civils at the Khoemacau Boseto processing …

Mammoth and mechanised: The beauty of Khoemacau

Comprising a measured, indicated and inferred resource of 92 Mt of copper containing high-grade 2.2% copper and +22 g/t of silver, Zone 5 will deliver 3.65 Mtpa of ore to the Boseto processing facility which will produce +60 000 tpa of copper and 2 Mozpa of silver (in concentrate).

Commissioning work commences at Discovery's Boseto …

Discovery Metals has started the commissioning of the concentrator at its Boseto Copper mine near Maun with the milling, flotation and production of

Boseto Copper Project

The Development Plan has evaluated longer term mining at Boseto. The Development Plan includes the establishment of both open pit and underground mining operations to …